Churches can't use a tax credit, but they can still get the federal geothermal credit: the IRS pays it to them in cash through a program called elective pay. For a congregation facing a worn-out boiler or a row of tired rooftop units, that payment can cover a large share of a geothermal system, and the system then costs less to run for decades.

Much of this applies to other nonprofits too.

The federal credit, and how a church gets paid

Geothermal heat pump systems qualify for the energy investment credit under Section 48 of the tax code. We checked the IRS's current forms before writing this. The 2025 Form 3468 has its own section for geothermal heat pump systems, and it works like this:

PieceAmountWhat it takes
Base credit30%Meet the prevailing wage and apprenticeship rules, or qualify for an exception. Otherwise the base is 6%.
Domestic content bonus+10%U.S.-made steel, iron and manufactured parts.
Energy community bonus+10%A site near a retired coal mine or coal plant, in a qualifying area, or on a brownfield. How to check.

The prevailing wage and apprenticeship rules have an exception for smaller projects. The Form 3468 instructions exempt energy projects with a maximum net output of less than 1 megawatt of electrical or thermal energy. Ask your engineer how your system measures against that. Our pipefitters are Local 562 union labor with registered apprentices, which makes those requirements easier to meet if your project needs them.

The percentage depends on when construction begins, and Congress changed several energy credits in 2025, so confirm the numbers for your start date with your tax advisor before you budget around them.

Because churches don't owe federal income tax, a credit alone wouldn't help. Elective pay fixes that. The IRS's elective pay FAQ lists tax-exempt organizations described in sections 501 through 530 as eligible, lists the Section 48 energy credit among the eligible credits, and uses a church as one of its examples of an organization that files Form 990-T to claim it.

The elective pay steps

  1. Build the system and put it in service. The church pays the full cost first. The IRS says the property should be placed in service before the church registers (IRS registration page).
  2. Register the project with the IRS. An authorized representative of the church registers through the IRS's Energy Credits Online portal and gets a registration number for the property. The IRS asks for registration at least 120 days before the return's due date, including extensions.
  3. File Form 990-T. The church files Form 990-T with Form 3468 and the registration number, and makes the election on an original, timely filed return. For a calendar-year organization, the return is generally due May 15, with a six-month extension available on Form 8868 (IRS FAQ). The return has to be filed electronically (IRS Publication 5817-D).
  4. Receive the payment. Filing early doesn't speed it up. The IRS says the payment isn't due until the return's due date, and timely filers can expect it within about 45 days of that date, though timing can vary.

Two funding details can shrink the credit, so raise them with your tax advisor early:

  • Grants and forgivable loans made specifically for the system. If that money plus the credit adds up to more than the system's cost, the IRS reduces the credit. General funds, and money that could be used for several purposes, don't count against it.
  • Tax-exempt bond financing may reduce the credit amount. Ordinary bridge loans and other financing generally don't affect the election.

Ask too how a capital campaign gift designated for the project is treated. It's a question for your advisor, not your contractor.

What the math can look like

Here's a hypothetical. Say a church gets a $600,000 bid to replace its sanctuary and education wing HVAC with conventional equipment. Using our planning estimate that geothermal runs about 44% more:

Conventional HVAC$600,000
Geothermal system$864,000
40% federal payment−$345,600
Geothermal after the payment$518,400

This example applies the credit to the full geothermal price. The credit applies to the geothermal equipment (the ground loop, heat pumps and related parts), not every line of a project, so the final amount depends on how the bid breaks out.

The church still writes the full $864,000 check first and waits for the payment, so plan the cash flow. Run your own number in the geothermal calculator.

How churches use their buildings, and why it matters

A church is not an office building. The sanctuary is a large, tall space that may be full for a few hours on a weekend and nearly empty the rest of the week. The fellowship hall fills for dinners and funerals. Offices and classrooms run on a weekday schedule, and a preschool or day care may run longer hours.

That pattern shapes a geothermal design in a few ways:

  • Zone the building by use. Separate heat pumps for the sanctuary, the hall, offices and classrooms let each one run on its own schedule, so the church isn't heating the whole building for a Tuesday committee meeting.
  • Size for the crowd. A full sanctuary on a hot Sunday is a big cooling load, because every person in the pews gives off heat. The equipment has to handle that peak even if it only happens a few hours a week.
  • Plan the warm-up. A sanctuary that sits at setback all week needs time to come to temperature before a service. The controls should start early enough, and the design should account for it.
  • The loop sees the whole year. A ground loop is sized for both the peaks and the total heat moved in and out of the ground over a year. A building with intermittent use has a different pattern than one running 60 hours a week, and a test bore and load calculation sort that out.

With the heat pumps indoors, there's no condenser noise outside the sanctuary windows during a quiet moment in the service.

Where the well field goes

The bores go down, not out, about 100 to 400 feet deep and roughly 20 feet apart (per the Department of Energy; a test bore sets the numbers for each site), so most churches can fit the loop on their own property. The usual places:

  • The parking lot. This is often the best spot, especially if the lot is due for repaving. The drilling, grading and new surface get done once.
  • Lawns and athletic fields. The surface is restored after drilling.
  • Not the cemetery. Burial grounds are off limits. If your church has a cemetery, the site survey maps it, along with any future burial sections the congregation plans to use, and the well field stays clear of both.

Drilling happens outdoors and can be scheduled around services, weddings and funerals. If space is tight, a hybrid system pairs a smaller loop with a boiler or cooler to handle the peaks.

Planning tips for church boards

  • Start before the old system fails. An emergency boiler replacement in January leaves no time to design a geothermal system.
  • Get a feasibility review. It looks at the building's loads, the available ground, a cost comparison with conventional replacement and the credit percentage your site qualifies for.
  • Bring in your tax advisor early to confirm eligibility, the registration timeline and how your funding sources affect the credit.
  • Specify U.S.-made equipment at the design stage to go after the extra 10%.
  • Plan for the cash gap between paying for the system and receiving the payment.

Schools follow almost the same elective pay process. Here's how it works for districts.

Next step

We'll walk your building committee through a feasibility review for your church. Request a free estimate or call 636-327-4238.

Call 636-327-4238Email us